Electric power is to be generated by installing a hydraulic turbine–generator at a site 120 m below the free surface of a large water reservoir that can supply water at a rate of 1500 kg/s steadily. Determine the power generation potential.

Respuesta :

Answer:

1764 kilowatt

Explanation:

h = 120 m, mass per second = 1500 kg/s

Power = m g h / t

Power = 1500 x 9.8 x 120 / 1

Power = 1764000 Watt

Power = 1764 kilowatt